FCC lets SpaceX launch up to one million orbital data center satellites
The FCC authorized SpaceX to build a million-satellite Starmind network in orbit, with service starting by 2033 and rivals already filing competing plans.
AIXVZ
AI agents that sell for you. AIXVZ builds sales agents and automates routine business processes — from first contact to deal.
Learn more
The Federal Communications Commission has authorized SpaceX to deploy up to one million satellites for its Starmind orbital data-processing network, calling it the first U. S. authorization for data centers in space. The constellation would operate between 500 and 1,002 kilometers in altitude, with the first satellite due by 2033. For workers and households, the decision signals that AI computing capacity may increasingly move off the ground.
Starmind terms, Nvidia hardware and deadlines
SpaceX filed its application about 10 months ago, and the FCC approval includes conditions on communications backups, regular updates and a detailed orbital debris mitigation plan. The agency requires the first satellite to enter operation no later than 2033, with the full constellation operating by 2040. In August, SpaceX said it was partnering with Nvidia to design the compute payload for the Starmind AI1 satellite, with each satellite to include Nvidia Rubin GPUs and Vera CPUs for datacenter-class space compute.
Production would build on SpaceX satellite operations in Redmond, Washington, which makes Starlink telecommunications satellites, while a filing tied to this year’s initial public offering said the Bastrop, Texas, operation would handle AI compute satellites. FCC Chairman Brendan Carr said compute campuses and data centers are essential to sustaining American leadership in artificial intelligence, and SpaceX chief executive Elon Musk replied on X that the approval would be a great asset to America and the world. The FCC said it continues to review other orbital data center proposals under its regular procedures.
What orbital computing means for jobs and bills
Supporters argue that solar-powered orbital data centers could ease pressure from terrestrial data centers over land use, electricity consumption and water needed for cooling, issues that figured in recent debates over rapid data center expansion. If the model works, growth in AI computing demand could depend less on local grid capacity and new large campuses near communities. That could affect construction and operations jobs tied to ground-based facilities, utility planning, and the political disputes around power and water costs.
The approval does not prove that orbital computing will work at scale or reduce costs. Critics cite cooling in space, space traffic management and orbital debris, and the FCC rejected opposition from Amazon and Viasat as well as the American Astronomical Society, which said it was disheartened and dismayed over effects on the night sky. Competing systems from Blue Origin, Starcloud, Cowboy Space, Google and Sophia Space remain proposals or tests, not operating networks.
// Read next
AI labs near cryptography breakthrough as expert panel prepares statement
A 21-expert cryptography panel lists a forthcoming statement as researchers point to an AI breakthrough in theoretical …
Musk: Google Wants to Rent More Computing Capacity From SpaceX
Elon Musk says Google is interested in renting additional computing power from SpaceX, a signal of how tight AI infrast…
RTX 5090 Cable Melt Triggers Air Quality Alarm in PC Owner Room
A Reddit user says a melting 12+4-pin cable on a Gigabyte RTX 5090 filled the room with particles and damaged the GPU p…
YouTuber builds working USB graphics card for 20 cents
Bitluni turned a 13-cent CH570 microcontroller into a monochrome USB graphics card using PWM video tricks and SRAM cach…